Premium
Threaded Connections
TMK UP Series

Case study

Delivery of Premium Integral Joint Pipes for the Implementation of the Program of Repair of the Nonoperating Well Stock of JSC “National Company “Kazmunaygas”

In order to eliminate the leakage of the production casing of emergency wells of the nonoperating stock of subsidiaries of the national company of the Republic of Kazakhstan JSC “NC “KazMunayGas”, the specialists of TMK developed individual technical conditions (TU) for the production of casing pipes with TMK UP TMK-1 integral joint.

Read more

The Run of 13 Chrome Premium Steel Pipes Was Performed in the Kirinskoye Field of PJSC Gazprom

In August and September 2018, the construction of 4 production wells was successfully completed in the Yuzhno-Kirinskoye field in the Sea of Okhotsk. The production string consisted of 273 mm and 245 mm L80 13Cr type casing pipes with TMK UP PF premium threaded connection.

Read more

Sakhalin Energy Successfully Performed the Run of TMK Premium Pipes In The Sea Of Okhotsk

On November 19, 2018, Sakhalin Energy successfully ran a casing string of 244.48 x 11.99 mm L80 type 1 with TMK UP PF premium threaded connection in the Piltun-Astokhskoye field in the Sea of ​​Okhotsk.

Read more

Delivery of Casing Pipes with TMK UP PF and TMK UP PF ET Connections for Lukoil Offshore Drilling

In August 2018, a casing with TMK UP PF ET premium threaded connection with a diameter of 273 mm, P110, was successfully run on MLSP-1 (small-sized offshore ice-resistant oil-producing platform) in the Yury Korchagin field in the North Caspian

Read more

Premium tubing with TMK UP PF connection were successfully applied for multi-stage fracturing in the field in Western Siberia

TMK UP PF is a premium tubing and casing connection, which allows working under conditions of increased combined loads, under the influence of high gas pressure and aggressive environments, in conditions, where standard solutions are not suitable.

Read more

TMK UP PF premium threaded connection was successfully run into the first exploration well in the Eastern Arctic

The run of the 177.8 x 9.19 mm TMK UP PF GW string was carried out under the supervision of TMK supervisors using a hydraulic tong.

Read more